It is planned to implement a project to build a 5 MW solar power plant on a private land plot of 8 hectares, which has the appropriate designated purpose for energy infrastructure.
The key advantage of the project is that we have already received the technical conditions for connection to the 35 kV line, which significantly reduces the risks and time of the preparatory phase.
The goal is to attract an investor for partial financing on the terms of corporate participation (entry into an LLC with a share), with a transparent management structure and profit distribution.
Key parameters
Type: Solar power plant (PV)
Capacity: 5 MW
Land: private, area 8 hectares
Land use: suitable for project implementation (clarify the wording from the documents - we will add it verbatim)
Connection: TU received, 35 kV level
Status: preparatory phase / ready-to-build after finalizing the documentation (can be left as is)
Need for investment / format of cooperation
Format: partial financing through participation in an LLC
Model: the investor enters the authorized capital (% share - to be agreed)
Options: phased financing in accordance with the stages (documentation → procurement → construction → commissioning)
What we provide to investors
The right of corporate participation in a project company (LLC)
Access to the package of documents (land, technical specifications, technical package)
Transparent financial model and implementation schedule
Coordinated management structure and cost control